Boxing in pipes: what to decide before the box goes on
A short guide to the decisions behind a good boxing-in job: access, clearance around pipes, materials and finish.
Boxing in looks like the simplest job in carpentry, and most of the time it is. The jobs that go wrong usually go wrong because of a decision nobody made before the first length of timber was cut. These are the questions worth answering first.
Will anyone need to get back in?
This is the big one. A straight run of copper or plastic pipe with no joints along it can be boxed in and left alone. Anything with a valve, a drain-off point, a joint you are not sure about, a meter or a heating manifold needs a way back in. That usually means a removable front panel fixed with screws, not glue or nails, so a plumber can take it off in minutes without damaging the decorating. If in doubt, assume access will be needed.
How much room do the pipes need?
Heating pipes expand and contract as they warm up and cool down. If a box is built tight against them, they can tick or creak against it every time the heating comes on. Leaving a small gap all round, and keeping fixings clear of the pipes themselves, avoids that.
What should it be made of?
For a painted finish indoors, MDF gives a smooth surface that takes paint well. In a bathroom, kitchen or anywhere damp, moisture-resistant board is the safer choice. Behind the board, a simple timber frame gives the panel something solid to fix to, rather than relying on plasterboard plugs.
Gas pipework is a separate question
If any of the pipework is gas, check with a Gas Safe registered engineer before it is boxed in. There are rules about how gas pipes can be enclosed, and that is a decision for the gas engineer, not the carpenter.
How will it be finished?
A box at floor level can be built to the same height as the skirting, or as a deliberate low plinth, so it looks planned rather than added. Decide whether it will be painted to match the wall or the woodwork, and whether the skirting needs to return around it. Those choices change how the box is built, so they are best made before it goes on.
See it on a real job
A recent job in Warsash shows two versions side by side: a plain pipe run boxed in like a deep skirting, and an underfloor heating manifold closed in on a timber frame. Read the Warsash boxing-in write-up, or see the Warsash carpenter page. For the wider service, see carpentry and joinery, and to get a price, use the estimate form.